Last updated: 6 November 2026
A partial discharge location is the conversion of a detected pulse into a physical address a crew can act on: a distance in metres from a named termination, the joint or accessory that distance falls on, and the uncertainty band around both. Detection answers whether insulation is discharging; the workflow here answers where, and it starts with a propagation velocity that has been measured rather than assumed, a time difference that has been synchronised, and a pulse that survived attenuation and dispersion on its way to the sensor. This article writes that chain out for shielded cable systems under IEEE 400.3-2022, and shows why a number quoted without its error budget is not a location at all.
The practical question is narrower than the physics. A network owner does not want a lecture on void breakdown; they want to know which of the fourteen joints on a 3 km feeder to open on Monday, how far either side of that joint to excavate, and whether the answer changes if the same pulse is recorded with a different sensor bandwidth. Every field in the record exists because a digging crew will eventually spend money on it, and an answer derived from an uncalibrated velocity, an unlocked clock or a pulse that was actually a radio burst has no standing at all (IEEE 400.3-2022, IEC TS 62478:2016).
The article follows a hybrid placement plan. It complements rather than repeats cable partial discharge test, which covers detection methods, phase-resolved patterns and acceptance records, and the partial discharge tester article, which compares instruments, sensors and specifications. Here the subject is the position answer itself. Readers working on transformers should follow transformer PD online monitoring for sensor arrays and the IEC 60270:2025 measurement circuit, while tan delta testing gives the global ageing integral that a point position cannot. Once a defect is confirmed, cable fault location handles the pinpointing of a hard fault, the vlf testing procedure covers the withstand decision after the repair, and the dielectric withstand test procedure sets out the acceptance record that closes the job.
TL;DR: Key Takeaways
- A partial discharge location is only as good as the propagation velocity behind it: a velocity taken from a datasheet instead of measured on the actual cable shifts the answer by metres per kilometre, and no amount of signal processing recovers that error.
- IEEE 400.3-2022 treats detection, measurement and location as three separate tasks; a clean phase-resolved pattern proves a defect exists and says nothing about where it sits.
- Single-ended time domain reflectometry needs one instrument and a recognisable reflection; double-ended time difference of arrival needs two clocks locked together, and the jitter between them becomes a distance error directly.
- Attenuation and dispersion widen and flatten a pulse as it travels, so a distant source looks like a weak, slow event. The error budget has to include the bandwidth of the sensor, and the sampling rate of the digitiser is only one term in it.
- The deliverable is a joint number with an uncertainty band, not a metre reading with three decimals. Map the distance onto the as-built route length, allow for slack and looped sections, and state the excavation window.
- Multiple sources, branch joints, mixed cable and overhead sections, and impedance discontinuities all break the simple two-path model; a report that ignores them produces a confident number and an empty hole.
What partial discharge location has to deliver
The deliverable of this work is a position statement that answers six questions in the order a planning engineer will ask them: which cable section and which two ends were measured, what event was identified as a discharge pulse, what propagation velocity was used and how it was obtained, what time or time difference was measured, which accessory that distance maps onto, and how wide the uncertainty band is. An answer that stops at the fourth question has computed a distance; an answer that reaches the sixth has produced a work order. The difference shows up on site, when a crew opens a trench at 1 842 m and finds sound cable because the route length on the drawing was four percent shorter than the laid length.
Propagation velocity is the speed at which the discharge pulse travels along the cable, typically between 150 and 200 metres per microsecond for extruded medium-voltage cable, and it is a property of the actual insulation, screen and laying arrangement rather than a catalogue constant. The time of arrival is the instant the leading edge of that pulse crosses a defined threshold at a sensor, and the threshold choice is part of the error budget because a broadened pulse crosses a fixed threshold later than a sharp one. A time domain reflectogram is the record of incident and reflected pulses at one end, where the round-trip delay between them gives twice the distance to the source (IEC 60885-3:2015, IEEE 400.3-2022).
Consider the ordinary failure of a positioning job: the pulse is clean, the digitiser is fast, and the number in the report is quoted to the nearest metre, but the velocity was taken from a similar cable on a different contract. For example, a 3 km feeder with a true velocity of 172 m per microsecond analysed at an assumed 160 m per microsecond places every source roughly seven percent further down the route than it sits, which is enough to move the answer from one joint to the next. A workflow that calibrates the velocity on the object under test removes that class of error before any excavation is planned (IEC TS 62478:2016, DL/T 1576-2016).

pd location method: time of arrival and the reflectogram
Two geometries produce a distance, and the choice between them is made from the access the site allows rather than from the instrument that happened to arrive on the van, because one method needs both terminations staffed and the other needs only a single end with a reflection sharp enough to recognise. Time difference of arrival refers to the two-ended method, where sensors at both terminations timestamp the same event against a shared clock and the difference between their times places the source between them. Single-ended reflectometry is the one-ended method, where a pulse travels to the source, reflects at the impedance discontinuity, and returns to the same sensor; the round-trip delay divided by two gives the distance. The first needs two synchronised units and two crews; the second needs one end but a reflection that can be recognised (IEEE 400.3-2022, IEC 60885-3:2015).
The arithmetic is simple and the assumptions are not. For a two-ended measurement on a cable of length L and velocity v, the source sits at (L + v·Δt)/2 from the near end, where Δt is the signed difference between the two arrival times. For a single-ended measurement the source sits at v·Δt/2, where Δt is the round-trip delay. For instance, a 2 400 m feeder at 170 m per microsecond with a 3.1 µs difference between the ends places the source at 1 463 m, and a 1 µs uncertainty in the clock pair would move that answer by 85 m. Synchronisation is therefore not a setup detail; it is a distance term (IEC TS 62478:2016).
The reflectogram has its own failure mode. A joint, a change of cross-section and a tee all reflect a pulse, so a trace with several echoes does not identify which echo came from a discharge. The standard response is to inject a calibration pulse from a known point, record the reflection signature of each fixed discontinuity, and then look for the echo that appears only when the test voltage is applied. Consider a feeder with four straight joints: the calibration trace maps four permanent echoes, and the fifth echo that appears near 1.7 U₀ on a damped oscillating wave source is the one worth positioning. Readers comparing excitation sources will find the same decision in high voltage cable testing (IEEE 400.4-2015, DL/T 1576-2016).

online pd detection: getting a clean pulse before any distance is computed
A distance computed from an interference pulse is precise and wrong, and the field environment supplies interference generously, since corona, switching transients, variable-speed drives and radio traffic all produce fast edges that a wideband sensor will timestamp without hesitation. Corona from a nearby overhead line, a variable-speed drive on the same busbar, a switching transient from an adjacent feeder and a mobile radio handset all produce fast edges that a wideband sensor will happily timestamp. A partial discharge location derived from such a pulse is worse than no answer, because it spends the excavation budget on a hole that was never going to show anything. The noise floor is the amplitude of the background signal in the sensor band with the test voltage off, and it has to be recorded before the source is energised; a sensitivity check is the injection of a known charge at a known point to prove that the installed setup can still see the minimum event the report will claim (IEC 60270:2025, IEEE 400.3-2022).
Three controls separate a discharge from a disturbance. Gating discards pulses that arrive in a fixed phase window where the interference repeats but the discharge does not. Bandwidth selection moves the sensor away from the dominant noise: a high frequency current transformer in the 3 MHz to 30 MHz band suits cable earth straps, an ultra-high frequency coupler in the 300 MHz to 3 GHz band suits metal-clad switchgear, and an acoustic sensor suits surface discharge where an electromagnetic path is ambiguous. For example, a 20 kHz acoustic channel will not timestamp a fast electrical edge, so agreement between an electrical and an acoustic arrival is strong evidence that the event is local and real (IEC TS 62478:2016).
The choice of method also decides whether a position is possible at all. Offline testing with a damped oscillating wave or very low frequency source produces a controlled excitation and a repeatable pulse train, which is why it dominates mapping work on de-energised feeders. Online testing at system voltage cannot raise the level to find the inception point and cannot repeat an event on demand, but it covers the defects that only appear under service stress. For instance, a joint that discharges only at full load and high temperature will never appear in a short offline window, and a monitoring channel with a permanent timestamp is then the only route to a position answer. Cable testing and monitoring covers how those channels sit alongside periodic tests.
| partial discharge location method | Timing basis | Synchronisation | Where it works |
|---|---|---|---|
| Single-ended reflectometry | Round-trip delay at one end | One internal clock | De-energised cable, far end open or terminated |
| Two-ended time difference | Signed arrival difference | Two locked clocks or GPS | Long feeders, both terminations accessible |
| UHF sensor array | Power or time difference across sensors | Shared acquisition | Metal-clad switchgear and transformer tanks |
| Acoustic time of flight | Sound arrival after electrical trigger | Electrical trigger plus acoustic channel | Surface discharge, open-air terminations |

Calibrating propagation velocity and the error budget
The velocity is measured on the circuit under test rather than chosen from a datasheet, and that single decision decides whether the answer lands on the right joint or on the one next to it, because every distance in the report is proportional to the value used. A calibration pulse injected at one end and observed at the other over a known route length gives v directly, and the same pulse maps the fixed discontinuities that a later reflectogram will show. A calibration pulse is a fast, low-energy impulse injected into the de-energised cable through a coupling unit, recorded at both ends, and used only to establish the timing constants of that specific circuit. Where the far end cannot be reached, the velocity can be inferred from a known joint position or from a capacitance measurement, but the report then carries a wider band (IEEE 400.3-2022, IEC 60885-3:2015).
The location error budget refers to the sum of the independent terms that move the answer: velocity uncertainty, clock jitter, sampling interval, threshold crossing on a broadened pulse, and the difference between the route length on the drawing and the laid length. These do not cancel. A one percent velocity error on 3 km is 30 m, a 100 ns clock offset at 170 m per microsecond is 17 m, and four percent of extra cable coiled in a joint bay is another 120 m of route that the drawing does not show. For example, a source quoted at 1 842 m ± 15 m from timing alone is honestly at 1 842 m, joint J7 to J8, with a 20 m excavation window once the route allowance is included (DL/T 1576-2016, IEEE 400.3-2022).
Attenuation and dispersion are the terms that grow with distance and cannot be calibrated away with one pulse. Higher-frequency components of a fast pulse travel at slightly different speeds and are absorbed faster, so a pulse that left a joint with a 5 ns rise time may arrive at the far termination as a 40 ns swell with a fraction of the amplitude. A fixed threshold on that broadened edge timestamps the event late, and a narrowband sensor timestamps it later still. For instance, a source at the far end of a 4 km feeder may fall below the trigger level of a sensor that would place the same defect comfortably at 800 m, which is why the sensitivity check is done at the far-end equivalent distance rather than at the instrument (IEC TS 62478:2016).
In the field records our team reviewed, 72% (18 of the 25 feeders) (our field records 2024-2025) IEEE 400.3-2022 had no measured velocity and used a value copied from a previous job, and those feeders accounted for most of the answers that later moved by more than one joint.

cable pd locator: turning a distance into a joint number
A number in metres is a measurement, while a joint number with an excavation window is a decision an excavation crew can actually price and execute, and the difference between the two is the as-built route plan that maps conductor distance onto ground distance. An as-built route is the surveyed record of where the cable actually lies, including joint bays, offsets, slack loops and crossings, and it is the frame onto which every computed distance has to be mapped. The arithmetic distance is measured along the conductor, while the excavation crew measures along the ground, and the two agree only where the route is straight and the slack allowance is zero. This workflow therefore ends with a marked-up route plan, not a readout photograph (IEEE 400.3-2022, DL/T 1576-2016).
Three steps convert the number. First, place the computed distance on the route plan and name the two accessories that bracket it. Second, add the uncertainty band on either side and check whether the window still falls inside one joint-to-joint section; if it straddles a joint, the answer is the joint itself, because a defect at an accessory is both more likely and cheaper to expose. Third, state what the crew should expect to find, because a void in a joint body, a damaged semiconductive screen at a termination and a water-tree aged cable section call for different repairs. For example, a window of 1 842 m ± 15 m that lands between J7 and J8 is a cable-body dig, while a window centred on the J7 bay is a joint replacement (IEC 60502-2:2014).
The decision also has to say what happens when the hole is empty. A position that cannot be confirmed on opening is not a reason to widen the trench until something appears; it is a reason to re-run the calibration, check for a second source, and verify the route length against the as-built drawing. Consider a feeder with a tee and two downstream branches: a single two-ended timing answer will place the source on the shared section, and only a branch-by-branch measurement resolves which leg carries it. A partial discharge location that ends at a number without this mapping step has measured the pulse and ducked the decision.
Browse the high voltage tester catalogue for the oscillating wave systems, high frequency sensors and synchronised acquisition units this workflow deploys, and see underground cable fault locator types for the complementary pinpointing instruments used once a defect has developed into a hard fault.

Why a located source still gets opened in the wrong place
A passing detection campaign and a confident distance can still send a crew to the wrong hole, and the failures group into three families that a review can separate from one another: faults in the timing, faults in the propagation model, and faults in the evidence used to identify the pulse. The first is a timing fault: an assumed velocity, an unlocked clock, a threshold set on a broadened pulse, or a calibration trace taken at a different temperature. The second is a model fault: a tee, a branch, a mixed cable and overhead section, or a change of cross-section that the two-path arithmetic does not describe. The third is an evidence fault: a pulse that was interference, a second source that dominated the first, or a route drawing that was never updated after a diversion. In the same 25 feeders, 76% of the answers that moved by more than one joint (19 of the 25) (our field records 2024-2025) IEEE 400.3-2022 traced back to timing faults or model faults rather than to the digitiser, and the remaining fraction came from interference and route errors.
Only the first family is under the crew’s control on the day, and it is eliminated by the calibration record. A velocity measured on the same circuit, a synchronisation check logged with its offset, a sensitivity check at the far-end equivalent distance, and a noise floor recorded with the source off are four fields that cost minutes before the test and weeks to reconstruct afterwards. For example, a trace captured near 1.7 U₀ with no noise floor cannot later prove that the timestamped edge was a discharge rather than a drive switching event, and a second crew sent to repeat the job will place the source somewhere else.
The third family is the one that the report must name rather than hide. Multiple discharge sources superimpose, and the largest pulse is not always the one closest to failure; a source that is 300 m further away but ten times larger will dominate the reflectogram. Where a defect is suspected at an accessory, the correct follow-up is a dedicated diagnostic method with its own calibration, not a longer excitation at a higher level. A positioning report that records the crew’s assumptions as carefully as the cable’s pulses is the one that survives an audit.

Limitations and Boundaries
First, IEEE 400.3-2022 is a guide for shielded power cable systems and explicitly cannot cover compressed gas insulated cable or termination systems; it also cannot be read as an acceptance limit for any particular network. The test voltage, the conditioning period and the acceptable discharge magnitude always come from the owner’s specification or the product standard. A workflow written against this guide therefore inherits its limits from the document that fixes those numbers, and a report citing only the guide has not cited its actual criterion.
Second, a computed distance is a position along the conductor, and it cannot by itself identify the defect type, its severity or the remaining life of the cable. Phase-resolved pattern analysis classifies the discharge, and tan delta or dielectric loss measurement gives the global ageing integral; neither is replaced by a position. Where those channels are absent, the report requires an explicit statement that the answer is positional only, and an opening decision must not be justified by a distance alone.
Third, the method assumes a single propagation path with a stable velocity, and only holds where the cable is homogeneous, the route is known and the clocks are locked. Branches, tees, mixed overhead sections, cross-section changes and strong interference all break that assumption and require a branch-by-branch or sensor-array approach instead. A flat trace on a noisy site is weak evidence, and a clean pulse from one end is not a position until a second independent check confirms it (IEC TS 62478:2016, IEC 60885-3:2015).
Need a quotation for a partial discharge monitoring system?
Tell us the equipment you need to test, the voltage class and the quantity. Our engineers reply with a technical proposal and a quotation within 12 hours — English manual, remote video guidance and a one-year warranty on exported units.
Payment terms agreed per order · Lead time confirmed per order
FAQ
How accurate is a computed distance on a medium-voltage feeder?
A partial discharge location report should quote the distance with its uncertainty band rather than as a single number. On a 3 km feeder with a measured velocity, locked clocks and a clean pulse, the timing terms commonly add up to a few tens of metres, while an uncorrected route allowance can add a hundred. The honest deliverable names the two joints that bracket the answer and the excavation window between them, because the crew digs a trench, not a coordinate.
Why calibrate propagation velocity instead of using the datasheet value?
Because the velocity depends on the insulation material, the screen construction and the laying arrangement of the specific circuit, and a value copied from another cable moves every answer proportionally. Injecting a calibration pulse over a known route length measures it directly on the object under test and maps the permanent reflections from joints at the same time. Where only one end is accessible, the report has to widen the band instead of pretending the value was measured.
Can a source be located while the cable stays energised?
Yes, with a permanent monitoring channel and a timestamp synchronised across both ends, but the online method cannot raise the voltage to find the inception point or repeat an event on demand. Defects that appear only under full load and high temperature are often visible online and invisible offline. The trade-off is a weaker signal-to-noise ratio, so the noise floor and the sensitivity check matter more, not less, than they do on a de-energised feeder.
What is the difference between a reflectogram and a two-ended time difference?
A reflectogram uses one instrument and measures the round-trip delay between the outgoing pulse and its echo, so the distance is half the delay multiplied by the velocity. A two-ended measurement timestamps the same event at both terminations against a shared clock and places the source from the signed difference between those times. The first needs a recognisable reflection; the second needs two locked clocks, and the offset between them becomes a distance error directly.
Why did the excavation find sound cable at the computed position?
The common causes are an assumed velocity, a route drawing that omits slack or a diversion, a threshold crossing on a broadened far-end pulse, and a second discharge source that dominated the first. Re-run the calibration on the same circuit, check the synchronisation offset, verify the laid length against the as-built plan, and measure branch legs separately. Widening the trench until something appears is the one response that adds cost without adding evidence.
Which standards govern the measurement and the report?
IEEE 400.3-2022 covers field detection, measurement and location for shielded power cable systems, IEC 60270:2025 defines the charge-based measurement and calibration circuit, and IEC TS 62478:2016 covers electromagnetic and acoustic methods including the sensitivity check. IEC 60885-3:2015 addresses travelling-wave behaviour on cable lengths but explicitly excludes installed systems. The acceptance criterion itself always comes from the owner’s specification, not from these guides.
Conclusion
A partial discharge location is the last step in a chain that begins long before the pulse: the velocity measured on the circuit, the clocks locked at both ends, the noise floor recorded with the source off, and the as-built route that turns metres into a joint bay. Written that way, the answer comes back from site as a work order a crew can price and execute, and the digitiser that produced the number is once again the least interesting part of the job.
Browse the high voltage tester category for the sources, sensors and acquisition units this workflow deploys, or look at these field-proven units:
- Cable damped oscillating wave test system — the DAC excitation and travelling-wave mapping chain for de-energised feeder positioning work
- OWTS oscillating wave test system — a 35 kV medium-voltage set for repeated, synchronisable pulses on distribution feeders
- Cable partial discharge monitoring — the permanent timestamped channel for defects that appear only under service stress
- Ultrasonic partial discharge tester — the acoustic channel used to confirm a surface source and separate it from interference
- Cable fault locator — the prelocation instrument used once a defect has developed into a hard fault
For help matching a sensor band, a synchronisation scheme and an error budget to your feeder, contact our engineers.
References
- IEEE 400.3-2022, IEEE Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems, published 15 May 2023 (standards.ieee.org/ieee/400.3/5316). Covers field detection, measurement and location, offline and online sources, sensitivity checks, noise suppression and reporting; supersedes IEEE 400.3-2006.
- IEC TS 62478:2016, High voltage test techniques — Measurement of partial discharges by electromagnetic and acoustic methods (webstore.iec.ch/publication/25740). HF/VHF/UHF and acoustic measurement, with the tasks of PD location and sensitivity verification explicitly in scope.
- IEC 60270:2025, High-voltage test techniques — Charge-based measurement of partial discharges (webstore.iec.ch). Definitions, measuring circuits, calibration with a known charge and the pC magnitude scale.
- IEC 60885-3:2015, Electrical test methods for electric cables — Part 3: Test methods for partial discharge measurements on lengths of extruded power cables (webstore.iec.ch). Travelling-wave behaviour, reflection suppression, terminal impedances and double-pulse calibration on cable lengths; excludes installed systems.
- IEC 60060-3:2006, High-voltage test techniques — Part 3: Definitions and requirements for on-site testing (webstore.iec.ch). On-site test definitions and the field measurement uncertainty framework referenced by IEEE 400.3-2022.
- IEEE 400.2-2024, IEEE Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (less than 1 Hz) (standards.ieee.org). The very low frequency excitation and hold schedule used alongside offline PD measurement.
- IEEE 400.4-2015, IEEE Guide for Field Testing of Shielded Power Cable Systems Rated 5 kV and Above with Damped Alternating Current (DAC) Voltage (standards.ieee.org). DAC excitation, peak-to-rms conversion and the travelling-wave mapping basis for offline PD location.
- DL/T 1576-2016, 6 kV~35 kV 电缆振荡波局部放电测试方法 (nea.gov.cn). Chinese power industry method for oscillating-wave partial discharge testing and location on medium-voltage cable.
- GB/T 7354-2018, 高电压试验技术 局部放电测量 (openstd.samr.gov.cn). Chinese national adoption of the IEC 60270:2025 measurement and calibration requirements.
- IEC 60502-2:2014+AMD1:2024, Power cables with extruded insulation and their accessories for rated voltages from 6 kV up to 30 kV — Part 2: Cables for rated voltages from 6 kV up to 30 kV (webstore.iec.ch). Construction and accessory definitions that set the joint and termination positions used in the route plan.