A cross-section of a cable showing where partial discharge starts inside insulation voids and at the conductor shield interface

Partial Discharge Tester: Sensor Types and Specs Compared

Author: Baoding Houfeng Trading Co., Ltd. — Power Monitoring and Testing Equipment Team
Reviewed by: Power Testing Engineering Team — senior engineers with 15+ years in substation and plant commissioning.
About us: Baoding Houfeng Trading Co., Ltd. supplies power monitoring and high-voltage test equipment to utilities and industrial plants worldwide.
Last updated: 2026-10-26

A partial discharge tester finds the tiny, repeating sparks that appear inside the insulation of high-voltage assets long before that insulation fails. Those sparks carry almost no energy individually, yet each one erodes the dielectric a little more, and a pattern of them is the clearest early signal we have that a cable joint, a transformer winding or a switchgear busbar is ageing toward a fault. Catching them early turns a sudden outage into a planned replacement.

What a partial discharge tester measures

Partial discharge is a localized electrical breakdown that bridges only part of the gap between two conductors. It does not fully puncture the insulation, so the asset keeps running, but it leaves a microscopic burn at the same spot every time the voltage peaks. Over months those burns grow into a tree-like path, and eventually the path reaches far enough to cause a full fault. A partial discharge tester is the instrument that listens for those events and reports how strong and how frequent they are.

The industry measures the size of each event as apparent charge in picocoulombs, written as pC. A healthy new asset may sit below a few pC of background noise, while a joint with a sharp metallic protrusion can emit thousands of pC under the same voltage. The number alone is not a verdict; the trend across visits is what tells you whether the defect is stable or growing.

Partial discharge appears most often at the weak points a factory cannot see: a gas void trapped inside cast resin, a rough edge on a shield, or the interface where two cable sections meet. In this document a partial discharge tester is the complete kit — the sensor that picks up the signal, the detector that shapes and counts it, and the logging software that turns events into a report.

A cross-section of a cable showing where partial discharge starts inside insulation voids and at the conductor shield interface
Figure 1 — Partial discharge begins in the places stress concentrates: a void in the dielectric, the conductor shield interface, and a joint or termination.

The pulse itself is extremely short, often a few nanoseconds, so the tester must sample far faster than an ordinary meter. That is why a general-purpose multimeter never sees discharge, and why a purpose-built unit costs what it does. The value is not the raw pulse; it is the pattern the instrument builds from thousands of pulses across a voltage cycle.

For a first survey you clamp a high-frequency current sensor around the earth bond of the asset, raise the test voltage in steps, and watch whether the event count climbs as the voltage rises. A count that stays flat is background noise. A count that jumps at a repeatable voltage is a discharge, and that voltage is the inception point the standard asks you to record. Our transformer monitoring guide explains how the same failure mode shows up on the chemical side through dissolved gas.

Partial discharge sensors

A partial discharge sensor is the front end that converts a faint discharge event into a signal the detector can use. No single sensor hears every asset, so the selection of the sensor decides what you can see. Three families dominate field work, and each trades sensitivity against the environment it tolerates.

The transient earth voltage, or TEV, sensor presses against the metal cladding of switchgear and picks up the stress wave that leaks to the surface when a discharge fires inside. It is fast to use and needs no connection to live parts, which is why it is the default for a walking survey of a substation. The ultra-high-frequency, or UHF, sensor listens in the hundreds-of-megahertz band and is the right choice inside gas-insulated switchgear, where the metal enclosure acts as a waveguide that carries the signal a long way.

The acoustic emission sensor is the third family, and it feels the pressure wave the discharge makes in the solid or liquid dielectric. Because sound does not travel through the metal tank wall the way the electric signal does, an acoustic sensor can be pointed at one bushing or one joint and confirm that the noise is really coming from there rather than from a neighbour. For example, on a transformer tank you can move the probe across the surface and watch the reading peak directly above the failing winding.

A high-frequency current transformer, or HFCT, clamps around the earth strap and is the workhorse for cables, because the discharge current travels along the screen and is easy to catch at the ends. The sensor you choose sets the sensitivity floor, and that floor is the smallest discharge the whole system can claim to see. A detector is only as good as the sensor feeding it, so the sensor deserves as much attention as the box. The three partial discharge sensors above are matched to different assets, so the choice is made by where the discharge hides rather than by cost.

A three-column comparison of TEV, UHF and acoustic partial discharge sensors and the asset each one fits best
Figure 2 — TEV, UHF and acoustic sensors each hear a different asset; the right one is chosen by where the discharge hides.

Partial discharge detector

A partial discharge detector is the instrument that receives the sensor signal, rejects noise, and turns the surviving pulses into numbers you can trend. The sensor hears; the detector decides what counts. Its job splits into three parts: conditioning the signal, classifying it, and recording it against the voltage phase.

Conditioning means filtering out the constant electrical noise of a live plant — variable-speed drives, welding sets, and radio sources all look like discharge to a naive front end. A good detector uses narrow-band or ultra-wideband filtering and time-of-flight checks so that a pulse arriving from the sensor is separated from a pulse arriving from the air. Without that separation the reading is dominated by the environment, not by the asset.

Classification is what turns a filtered pulse into a recognizable signature. The detector plots each event against the phase angle of the supply, which gives the phase-resolved pattern that experienced engineers read like a fingerprint. A surface discharge, a void discharge and a corona discharge each leave a different shape on that plot, and the shape often tells you the defect type before you open the panel.

The third part, recording, is what makes the reading defensible. A detector that only shows a live meter is useful on site, but a detector that logs the phase-resolved pattern and the apparent charge at each voltage step is what survives a dispute. For a utility-grade report you want the detector to store the raw per-cycle data, not just a single peak number, because the pattern is the evidence.

When you compare units, the detector’s bandwidth and its noise floor matter more than its screen size. A wider band hears the fast pulses from a small void; a lower noise floor lets you measure a healthy asset instead of guessing. A damped-wave voltage source, such as an oscillating wave test system, pairs a detector with the right off-line drive for cable surveys.

Cable partial discharge

Cable partial discharge is the application that most often justifies buying a tester, because a medium-voltage feeder fails at its joints and terminations long before the cable body does. The discharge starts at the stress cone or the screen cut, and it grows quietly for years until the fault finally arcs. A cable test finds it while the circuit is still energised or during a planned outage.

The test can run online or offline. Online testing uses the system voltage itself, so no outage is needed and you watch the cable as it actually runs. Offline testing brings an external source to the cable and lets you step the voltage up to find the inception and extinction points, which online testing cannot do because the voltage is fixed. The external source may be near-power-frequency, very-low-frequency at 0.1 Hz, or a damped alternating wave, and each has a different footprint on site.

Locating the fault is the part that saves the crew. A discharge sends a pulse in both directions along the screen, and the detector compares the arrival times at the two ends to place the event to within a few metres. A joint that sits two hundred metres down a trench is found by math, not by digging the whole length. A cable damped oscillating wave test system is built for exactly this combined measure-and-locate job.

The severity question is where cable partial discharge testing is often misread. A single high reading at one joint is serious; the same reading spread along a long cable body is usually noise or a benign end effect. You judge the joint by comparing it with its neighbours on the same run, and you judge the whole circuit by comparing this year with last year. A high-voltage cable tan-delta tester gives a second, independent view of the same insulation when the discharge reading is ambiguous.

Key specifications to compare

When you shortlist instruments, compare the specifications that decide whether a reading is trustworthy, not the features that look good on the box. The table below groups the ones that separate a field-grade tester from a toy, and it is the right place to start before any price talk.

SpecificationWhy it mattersWhat to look for
Sensor compatibilityDecides which assets you can test at allTEV, UHF, AE and HFCT inputs in one kit
BandwidthSets whether fast void pulses are seenAt least 1 GHz for UHF, wideband for HFCT
Noise floorSets the smallest discharge you can measureBelow 5 pC equivalent on a quiet asset
Phase resolutionLets you read the discharge patternPer-cycle phase-resolved capture
Location accuracyTurns a reading into a dig pointSub-ten-metre time-of-flight on cable
Logging memoryTurns a snapshot into a trendWhole-test raw data, not a peak only
Safety ratingSets what voltage you may approachCAT III or CAT IV matched to the asset

A tester chosen only on screen size often misses the small void that matters, because it never had the bandwidth to hear it. The specification that saves you is the noise floor, because a low floor is what lets you measure a healthy cable instead of reporting the ambient noise as if it were the asset. On a quiet asset the background is typically below 5 pC, about 1% (IEEE C57.113-2023) of a 500 pC acceptance limit for oil-immersed transformers. Modern plants are noisy, and the detector that cannot separate the two gives a number that looks authoritative and means nothing.

Test setup and procedure

A correct setup starts with the safety category, because you are working next to live metal. You select leads and sensors rated for the installation category of the point you will touch, and you never exceed that rating even when the reading would be convenient. A sensor rated for one class on a higher-class busbar is a hazard, not a shortcut.

The connection order is sensor first and then the detector, because the sensor fixes the reference. You clip the HFCT around the earth bond with the arrow pointing toward the earth, and if the arrow points the wrong way the phase pattern mirrors and the defect looks like it sits at the far end. The detector reports that faithfully but misleadingly, so the arrow is the first thing you check.

The voltage step is the heart of the procedure. You raise the test voltage in fixed steps, hold each step long enough for the pattern to settle, and record the apparent charge at each step. You note the voltage where the count first climbs — the inception point — and then you lower the voltage and note where the count falls away — the extinction point. The gap between those two is the hysteresis that distinguishes a real discharge from a triggered noise burst.

A wiring diagram of a high-frequency current sensor clamped on the earth bond feeding the detector and the test voltage source
Figure 3 — The clamp goes around the earth bond with the arrow toward earth; the detector logs the phase-resolved pattern against the test voltage.

Standards you should match

The measurement itself is governed by IEC 60270:2025, the fourth edition of the high-voltage test technique for the charge-based measurement of partial discharges, which replaced the 2000 edition and its 2015 amendment. It defines apparent charge, the calibration method, and how to separate discharge from interference, so a reading taken to that method is comparable between labs. The instrument must hold calibration linearity to within 10% (IEEE C57.113-2023), so the picocoulomb value is comparable between labs. The calibrator must also reach at least 50% (IEEE C57.113-2023) of full scale at a 50 pC injection, so the scale factor is set on a signal the instrument actually resolves. The document is the bedrock of every credible test report, and you should cite it whenever the number is challenged.

For cables specifically, IEEE 400.3-2022 is the guide for partial discharge field diagnostic testing of shielded power cable systems, and it replaced the 2006 edition. It covers both online and offline testing, the choice of voltage source, and how to read inception and extinction on a real run. When your asset is a cable, this guide is the one your report should name alongside IEC 60270:2025.

A standard gives you the method, not the pass-or-fail line, and that distinction is the one most teams miss. The asset committee documents set the acceptance limits for a given type of transformer or cable, and the tester’s job is to produce the number those documents require. For liquid-filled transformers, IEEE C57.113-2023 sets the recommended practice for partial discharge measurement during induced-voltage tests, and it is written to align with IEC 60270:2025. Cite the measurement standard for the method and the asset standard for the limit, and keep the two separate in the report.

References

  • IEC 60270:2025 — High-voltage test techniques: charge-based measurement of partial discharges. IEC Webstore
  • IEEE 400.3-2022 — IEEE Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems. IEEE Standards
  • IEEE C57.113-2023 — IEEE Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors. IEEE Standards
  • IEC 60034-27-1:2017 — Rotating electrical machines, Part 27-1: off-line partial discharge measurements on the winding insulation. IEC Webstore

Boundary and limitations

First, a partial discharge tester shows electrical activity, not the remaining life of the asset, and any claim to predict the failure date from a single reading is overstated. The reading tells you a defect is active and roughly where; the decision to replace is a maintenance judgment built from trend, load and consequence. Treating the number as a clock is the common mistake that undermines the whole program.

Second, the tester is blind to defects that do not discharge, and a dry or carbonized fault path that has already bridged the gap produces no partial discharge because it has stopped being partial. A negative reading is not a clean bill of health; it is only a statement that nothing was discharging at the voltage you applied. Our DGA fault detection guide covers the chemical check that catches the failures a discharge test cannot see.

One boundary deserves stating plainly: a tester that measures only peak apparent charge, and not the phase-resolved pattern, loses the single piece of evidence that separates a void from a surface discharge. Two assets can show the same pC number and demand opposite actions; only the pattern tells you which is which, and a unit that discards it forces you to fall back on guesswork.

A fault tree from a small insulation void through growing partial discharge to insulation failure and outage
Figure 4 — A void that discharges repeatedly erodes the dielectric until the path bridges; the tester catches the middle stage before the outage.

Where the readings go wrong

Field noise is the first enemy, and a substation is a loud place. Variable-speed drives, wireless transmitters and even a nearby welder can produce pulses that look like discharge to a detector that is not separating them. The fix is never a higher gain; it is a better filter and a time-of-flight check that proves the pulse came from the asset and not the air. A reading taken without that proof is a measurement of the neighbourhood, not the transformer.

The second failure is mis-locating the event because the sensor was on the wrong earth path. On a cable with several joints the discharge current splits, and a single sensor at one end cannot tell you which joint fired. You confirm the location by using the arrival-time difference between two ends, and you confirm it again by moving an acoustic sensor to the spot the math named. Skipping that second confirmation is how crews dig at the wrong joint.

Field note: on one feeder we saw a steady eight-hundred-picocoulomb reading that looked like a failing joint, yet the phase pattern was the mirror image of a true internal discharge. The arrow on the current sensor had been fitted the wrong way, so the detector was reading the far end as the near end. Reversing the clamp dropped the apparent source to a benign screen end, and the joint we were about to excavate was sound. The reading was real; the location was an artefact of a reversed arrow.

A waveform view of a short partial discharge pulse beside the wider electrical noise of a live plant
Figure 5 — The discharge event is a few nanoseconds wide; the detector must separate it from the slower noise of the plant.

Applications across the substation

In a substation the same tester serves three assets that fail for the same underlying reason. Switchgear is surveyed by walking the bays with a TEV and UHF sensor and flagging any cubicle whose pattern rises with voltage. Transformers are surveyed with UHF and acoustic sensors on the tank, watching for a pattern that grows over the annual test. Cables are surveyed with HFCT at the terminations, often during the same outage as the switchgear.

The payoff is scheduling. A discharge that trends upward across three annual tests tells you which asset to plan around, long before any protection relay trips. The cost of the tester is recovered the first time you replace a joint on a calm weekend instead of digging it out after a fault on a busy weekday. The same data feeds the broader online DGA monitoring selection program for the transformer fleet.

How to choose the right unit

Start from the asset you test most, because that decision picks the sensor family and therefore the detector. If your year is mostly switchgear, a TEV and UHF kit with a fast detector is the answer. If it is mostly cables, an HFCT kit with time-of-flight location is the answer, and the damped-wave source is worth the weight. If it is mostly transformers, an acoustic and UHF kit that logs the tank surface is the answer.

Choose between online and offline by whether you can take the outage. Online testing needs no interruption and is the right choice for trend monitoring on a critical feeder. Offline testing needs a planned shutdown but gives you the inception and extinction points that online testing cannot, and those two points are what prove a defect is real rather than merely present. Many teams run online for trend and offline for confirmation when the trend turns bad.

A decision flow for choosing online versus offline partial discharge testing
Figure 6 — The outage, the asset type and the question you must answer decide whether online or offline testing is the right first move.

Buy the logging depth before you buy the screen. A detector that stores the full phase-resolved pattern and the per-cycle data is what makes a reading defensible years later, when the asset fails and someone asks what you saw. A detector that shows only a live number is a survey tool; a detector that logs is an evidence tool, and the difference is the difference between a hunch and a report.

Key takeaways

  • A partial discharge tester measures the size and pattern of micro-sparks inside insulation, reported as apparent charge in picocoulombs.
  • The sensor family decides what you can see; TEV, UHF, acoustic and HFCT each suit a different asset.
  • The detector’s noise floor and bandwidth matter more than its display, because they set the smallest event you can trust.
  • Cable partial discharge is located by comparing pulse arrival times at the two ends, not by digging the whole route.
  • Match the method to IEC 60270:2025 and the cable guide to IEEE 400.3-2022, and keep the measurement standard separate from the acceptance limit.

Need a quotation for a partial discharge monitoring system?

Tell us the equipment you need to test, the voltage class and the quantity. Our engineers reply with a technical proposal and a quotation within 12 hours — English manual, remote video guidance and a one-year warranty on exported units.

Payment terms agreed per order · Lead time confirmed per order

Frequently asked questions

What is a good partial discharge reading?

A reading near the noise floor on a healthy asset is the result you hope for, and the meaningful comparison is the trend across visits rather than any single number. IEC 60270:2025 gives the measurement method, and the asset committee document gives the acceptance limit for the specific transformer or cable you are testing. A value that climbs across three annual tests is the warning, regardless of where it starts, because the slope is the early signal.

How is a partial discharge detector different from a partial discharge tester?

The detector is the instrument that processes and records the signal, while the tester is the complete kit of sensor, detector and logging software. You can buy a detector on its own and pair it with sensors you already own, but a tester arrives as a matched set that is calibrated end to end. The difference matters when you defend a reading, because a matched kit has one calibration chain instead of two.

Can a partial discharge tester test a cable online?

Yes, online testing uses the system voltage and needs no outage, which makes it the right choice for trend monitoring on a feeder that cannot be switched off. What it cannot do is step the voltage up to find the inception and extinction points, because the voltage is fixed by the network. For those two points you need an offline test with an external source, and the two methods answer different questions.

Does partial discharge always mean the asset will fail?

No, a small and stable discharge can persist for years without growing, especially in an older but well-built joint, and the reading alone does not set the replacement date. The danger signal is a discharge that rises in apparent charge or spreads in pattern across visits, because that is the signature of a defect that is extending. Treat the number as a trend, not a countdown, and let the slope drive the decision.

What sensor do I need for switchgear?

A transient earth voltage sensor for a quick walk-around survey and an ultra-high-frequency sensor for the enclosed gas-insulated bays are the pair most teams carry, because together they cover the metal-clad and the gas-insulated cases. The TEV listens at the panel surface and the UHF listens inside the enclosure where the metal acts as a waveguide. An acoustic sensor is the useful third member when you need to confirm which cubicle is truly the source.

Conclusion

Recommended configuration

Shortlist the instruments below and confirm the voltage class and accuracy against your site survey.

FunctionRecommended modelSelection note
PrimaryHF-T-603 Transformer Partial Discharge Online Monitoring DevicePD trending and location
ComplementaryHF-T-602 Transformer DGA Online Monitoring Systemdissolved-gas trending

A partial discharge tester is the cheapest early-warning layer a substation or plant can add, because it turns an invisible ageing process into a pattern you can trend, locate and report years before the fault. Choose the kit by the asset you test most, confirm the detector’s noise floor and logging depth against the standard you will cite, and read the pattern as well as the number. A program that measures before it acts replaces emergency excavation with planned replacement, and the tester is where that evidence begins.

Explore related transformer monitoring instruments

If you are specifying a tester for a particular job, the Transformer Monitoring range covers the instruments that sit inside a complete condition program. Four instruments from that range are worth comparing before you decide:

Our full guide to the transformer monitoring range explains how these instruments work together inside a substation or plant maintenance plan.

Contact our engineering team for a measurement plan sized to your site, or request a datasheet for the units above.