Blog — Houfeng

Category Blog

Blog

Relay Tester Selection: 7 Specs and Setup Steps

Relay tester

Author: Baoding Houfeng Trading Co., Ltd. — Power Monitoring and Testing Equipment Team,supplying relay test sets and high voltage test instruments to utilities and EPC contractors since 2026Technical review: reviewed by the in-house power testing engineering team against IEC 60255-1:2022 and GB/T…

Transformer Monitoring: 8 Parameters and System Types

Insulation ageing rate against hot-spot temperature rise, using the 6 °C doubling rule from IEEE C57.91:2011.

Transformer monitoring helps EPC contractors, asset owners and electrical engineers assess transformer operating conditions, identify abnormal trends and make better-informed maintenance decisions. The right installation depends on transformer type, asset criticality, fault risks and the information the maintenance team actually…

IEC 60270:2000 PD Compliance: 6 Test Setup Rules

How to Comply with IEC 60270 for Transformer PD Monitoring

Compliance with IEC 60270:2000 for transformer PD monitoring requires more than using an IEC 60270:2000-compatible PD detector. The complete measurement setup—including the test circuit, measuring system, calibration, background-noise control, measurement procedure, and recording of results—must be properly configured and verified.…