Current transformer wiring connection diagram showing the primary conductor, secondary burden, meter and protection relay

Current Transformer Wiring: Install, Polarity, Grounding

current transformer wiring guide is the practice of connecting current transformers (CTs) so the secondary circuit feeds meters, relays and protection devices with a signal proportional to the primary current, and it is the step that decides whether the measured current and the protection operating signal match the real load. Related solution: Monitor-Test Power Tester and Switchgear Monitoring Guide. The current transformer is the instrument that makes this step possible, and its construction is covered in the SF6 Breaker Guide.

Author: CT Wiring Guide Services, Monitor-Test Switchgear Team
Reviewed by Baoding Houfeng Trading Co., Ltd. PE team, senior current transformer wiring engineer, 8+ years of CT wiring review
About us: Monitor-Test Switchgear Services — CT wiring verification, accuracy testing and secondary circuit diagnostics for utility and plant teams
Last updated: 5 November 2026

TL;DR: Key Takeaways

  • Every CT secondary circuit must be wired within the rated burden, because a CT that is overburdened saturates and the protection signal drops before the fault current is fully measured.
  • The polarity markings (P1/P2 on the primary side and S1/S2 on the secondary side) define the wiring direction, and reversing one pair inverts the signal and trips differential protection on the normal load.
  • The secondary circuit must be grounded at one point only, because multiple ground points create a loop that carries fault current and corrupts the measurement.

Why CT wiring decides the measurement and protection chain

A current transformer is an instrument transformer that scales the primary current down to a measurable secondary current, typically 1 A or 5 A, and the secondary circuit is the wiring path that carries that scaled signal to the meter and the protection relay (IEEE C57.13-2016). The rated burden is the maximum impedance the CT can drive at its rated accuracy, and it is specified in VA on the nameplate (IEC 61869-2:2012). The accuracy class refers to the composite error the CT is allowed to produce at its rated burden, and the class is written next to the ratio on the nameplate.

The wiring decides the accuracy because the CT is a current source with a fixed ratio: the secondary current equals the primary current divided by the ratio, and the wiring only has to keep the burden within the rated VA. For example, a 1000/5 A CT at 0.5 accuracy class wired to a 20 VA burden measures within 0.5% composite error (IEEE C57.13-2016). The same CT wired to a 60 VA burden saturates, and the meter reads low while the protection relay sees a distorted signal. Consider a site where the metering CT is wired through a long cable run with a burden above the nameplate rating. In that case the measurement error grows with the wiring, not with the CT itself. The longer the cable run, the higher the impedance, and the earlier the core saturates during a fault. This is why the wiring check measures the burden with the installed cable, not just the nameplate rating.

The CT secondary rated current is typically 1 A or 5 A (IEEE C57.13-2016), the metering accuracy classes are 0.2, 0.5 and 1, and the protection accuracy classes are 5P and 10P with the voltage-time class (IEC 61869-2:2012) — the tighter the class, the more defensible the metering and protection decision.

A CT that reads correctly on the bench can still feed a wrong signal in the switchgear, because the installed cable run adds burden impedance that the nameplate rating does not include — only the wiring verification against the real burden closes that gap. The verification before energization measures the total burden against the nameplate rating, because the CT can only deliver its rated accuracy when the burden stays inside the rating.

Current transformer wiring connection diagram
Figure 1 — Current transformer wiring connection diagram showing the primary conductor, secondary burden, meter and protection relay.

This connects to high-voltage-switchgear practice, because the same secondary circuit feeds the online monitoring system that tracks the load trend over time.

ct transformer installation

ct transformer installation is the mechanical and electrical step sequence that puts the CT on the switchgear bus, threads the primary conductor through the window core in the P1 to P2 direction, and brings the secondary terminals S1 and S2 out to the terminal block (IEC 61869-1:2020). The terminal torque is tightened to the manufacturer’s value, and the dot convention means the P1 and S1 terminals are the same polarity point, so the primary current entering P1 produces a secondary current leaving S1. The installation opens with the mechanical check, because a CT that is mounted loosely or with an untightened bus joint will read correctly on the secondary side while the primary joint overheats. The secondary terminals are then wired to the terminal block without a sharp bend, because a bent conductor adds impedance that the nameplate burden does not include. The polarity test is run last on the energized pair, confirming that the P1 to P2 direction produces the S1 to S2 signal before the circuit is left unattended.

The installation is graded by the mechanical condition and the primary connection, not by the wiring alone. A CT installed with a loose primary connection can overheat at the joint while the secondary circuit reads correctly, so the installation check covers the bus connection, the CT fixing and the terminal torque (GB/T 20840.1-2013). For example, a 1000/5 A CT installed with the primary conductor through the window in the P1 to P2 direction keeps the dot convention aligned with the S1 to S2 terminal pair, and the polarity test confirms the alignment before the circuit is energized (GB/T 20840.2-2014). The same record also captures the deadline for the next comparison, because the thermal drift at the bus joint has to be tracked over the service cycle rather than checked once.

Current transformer construction layer diagram
Figure 2 — Current transformer construction layer diagram showing the window core, primary winding, insulation and secondary winding layers.

The excitation curve is the plot of the secondary voltage against the excitation current, and it is used to check the CT core condition during installation verification (GB 50150-2016). A CT whose excitation curve has dropped below the nameplate knee point has an aging core, and the wiring cannot restore it. The installation record documents the mechanical check, the polarity test and the excitation curve, so the next test pass can compare against the same baseline.

ct wiring convention

ct wiring convention defines how the secondary terminals are connected to the burden, the meter and the protection relay, and it keeps three things true at the same time: the burden stays within the rated VA, the polarity stays consistent across the meter and the relay, and the secondary circuit stays grounded at one point. The two standard connection schemes are the star wiring, where each phase CT secondary is wired independently to the meter and the relay, and the differential wiring, where two CTs on the same circuit feed a differential relay that compares the two secondary currents.

The polarity markings are the P1/P2 and S1/S2 labels on the CT nameplate, and they define the wiring direction: the primary current entering P1 produces a secondary current leaving S1 (IEEE C57.13-2016). Reversing one pair inverts the signal, and the differential relay then sees the sum of the two normal load currents as a fault and trips the circuit. For example, a metering CT wired with a burden resistor that exceeds the rated VA raises the secondary voltage, the core saturates, and the meter reads low while the protection relay sees a distorted signal.

Current transformer secondary current waveform comparison
Figure 3 — Current transformer secondary current waveform comparison showing the primary current and the secondary current on the same axes.

The waveform shows the ratio between the primary current and the secondary current on the same axes: the secondary amplitude is the primary amplitude divided by the ratio, and the phase is inverted when the polarity pair is reversed. The saturation region appears at the high-current end, where the CT core cannot follow the primary current and the secondary waveform flattens. Read against that waveform, the wiring decisions in this current transformer wiring guide follow the amplitude and the phase, not the ratio alone.

current transformer grounding

current transformer grounding is the one-point connection of the secondary circuit to the switchgear ground, and it exists to protect the metering and protection circuit from a primary-to-secondary fault that would otherwise drive a dangerous potential onto the secondary wiring. The secondary terminal S2, or the designated ground terminal, is connected to the switchgear ground bar at one point only, and the ground bar is bonded to the equipment ground (OSHA 29 CFR 1910.269). The single-point ground is the one grounding connection that keeps the secondary circuit referenced without creating a loop. The concern is not the normal operation but the insulation failure between primary and secondary, which can transfer a hazardous voltage into the secondary console that operators touch while reading the meter. The single-point ground diverts that voltage to the ground bar instead of through the burden resistor.

For example, a secondary circuit grounded at the terminal block and again at the protection panel creates a loop that carries fault current between the two points, and the loop current adds to the measured signal. The loop also scales with the distance between the two ground points, so the reading drift grows with the cable length between them. The distinction is made by tracing the secondary wiring to a single ground point: a circuit with two grounds shows a loop current on the ground conductor, and the measurement drifts with the fault current. This connects to grounding system design practice, because the ground bar is part of the equipment ground network. A second check confirms the bond resistance between the ground bar and the equipment ground, because a failed bond turns the single-point ground into a floating reference that no longer protects the secondary circuit.

A CT secondary circuit grounded at two points can read zero on the meter while carrying fault current through the ground loop — the single-point ground rule is the distinction between a measurement and a hazard.

current transformer wiring guide: verification and test interval

A current transformer wiring guide organizes three checks against the installed wiring before the circuit is energized and the compartment is handed over: the polarity check, the ratio check and the excitation curve (GB 50150-2016). The polarity check confirms that the S1 to S2 wiring matches the P1 to P2 direction, the ratio check confirms that the secondary current is the primary current divided by the nameplate ratio, and the excitation curve confirms that the CT core reaches the knee point at the rated voltage.

Each wiring option maps to the accuracy class the meter and relay duty support, so the burden selection in the matrix follows the duty it has to serve.

CT accuracy class and burden matrix

wiring option (current transformer wiring guide)rated burdenaccuracy classbest for
star wiringwithin rated VA0.2S / 0.5 / 5P20metering and protection
differential wiringwithin rated VA5P20 / 10P10differential protection
metering-only wiringwithin rated VA0.2 / 0.5revenue metering

The CT wiring verification covers the polarity check, the ratio check and the excitation curve (GB 50150-2016), and the test interval follows the usage frequency of the switchgear (DL/T 596-2021) — a CT on a breaker that switches daily is verified more often than one on a breaker that switches rarely.

Current transformer wiring test interval timeline
Figure 4 — Current transformer wiring test interval timeline showing the 24 month, 12 month and 6 month intervals against the switching frequency.
Current transformer wiring accuracy reading comparison
Figure 5 — Current transformer wiring accuracy reading comparison showing the composite error of each accuracy class against the rated burden.
Current transformer wiring verification setup layout
Figure 6 — Current transformer wiring verification setup layout showing the primary injection source, the CT, the secondary burden and the ground connection.

The verification result is recorded in the maintenance register, so the next test pass can compare against the same baseline. The wiring result reflects the burden path and the polarity direction, and the compartment stays safe during the service cycle. When the register shows the same polarity direction and the same burden reading from the previous pass, the circuit is still wired to the same reference, which matters when a fault appears months later and the trend has to be read against an unchanged baseline.

Limitations and Boundaries

Three boundaries are worth stating before current transformer wiring is scheduled. Each boundary limits what the wiring check and the verification can claim even when the CT is installed correctly and the test readings are clean.

First, the wiring guide assumes the CT ratio and accuracy class match the meter and relay requirements, because a mismatched class cannot be fixed by wiring. A CT wired perfectly still measures wrong when the nameplate ratio does not match the meter program. The ratio check must be confirmed against the protection setting before the wiring is trusted. This assumption holds only when the nameplate data is read correctly and the meter software is loaded with the same ratio.

Second, the wiring convention applies to the secondary circuit only, because it cannot verify the primary insulation or the CT mechanical condition. A wiring check that passes may still sit on a CT with an aging core or a loose primary joint. The excitation curve and the primary connection must be confirmed separately during the installation pass, and neither of them is declared by the wiring test. Both checks share one baseline, but neither replaces the other.

Third, the wiring verification only grades the secondary circuit under the test bench conditions, because it does not confirm the actual burden impedance in the installed cable run. A CT that passes the burden check on the bench may still be overburdened through a long cable run. The real burden must be measured with the cable in place before the verification result is trusted, and the cable length is the main variable that makes the bench number diverge from the installed number.

The wiring verification follows the standard hand-over test practice for current transformers, and it is applied in this guide without changing the test band itself.

The wiring verification only grades the secondary circuit under test conditions, not the primary insulation inside the CT — the insulation test must be confirmed separately before the wiring result is trusted.

Contact our CT verification team for a tailored verification solution for your switchgear burden conditions, and request a technical documentation for your installation. The verification scope can be adjusted to the switchgear age, the cable length and the protection duty before the test pass starts. The deliverable is a signed verification report with the polarity record, the ratio record and the excitation curve, so the next service cycle reads from the same baseline and the next engineer works from the same numbers.

Need a quotation for an instrument transformer tester?

Tell us the equipment you need to test, the voltage class and the quantity. Our engineers reply with a technical proposal and a quotation within 12 hours — English manual, remote video guidance and a one-year warranty on exported units.

Payment terms agreed per order · Lead time confirmed per order

FAQ

How should the CT secondary circuit be wired to the burden and the meter?

The CT secondary circuit is wired from the S1 terminal through the burden resistor to the meter and the protection relay, with the S2 terminal connected to the switchgear ground at one point only. The wiring keeps the total burden within the rated VA (IEC 61869-2:2012), and the polarity test confirms that the S1 to S2 wiring matches the P1 to P2 direction before the circuit is energized. The cable must be routed away from the primary conductor run where possible, because the proximity adds induced voltage that the burden resistor does not account for and the measuring chain has to be read with the load applied.

Does the CT polarity marking decide the wiring direction?

Yes. The P1 and S1 terminals are the same polarity point under the dot convention, so the primary current entering P1 produces a secondary current leaving S1 (IEEE C57.13-2016). Reversing one pair inverts the signal, and the differential relay then sees the normal load as a fault and trips the circuit. The marking change does not damage the CT, but it does misdirect the protection signal on every match. The polarity test is run before energization because the relay cannot distinguish the reversed pair from a real fault until the circuit is loaded. Once the pair is reversed, the differential relay measures the negative of the load current, and the trip logic fires at the normal load level.

Can a CT be wired to more than one ground point on the secondary side?

No. The secondary circuit must be grounded at one point only, because two ground points create a loop that carries fault current between them and corrupts the measurement. The ground is made at the S2 terminal or the designated ground terminal, and the single ground connection is confirmed by tracing the secondary wiring (OSHA 29 CFR 1910.269). The current transformer wiring guide keeps this rule visible on every wiring diagram, because the loop current is invisible until the relay or the meter reads it.

How often should the current transformer wiring be verified?

The verification interval follows the usage frequency and the criticality of the equipment, and it is set by the preventive test regulations (DL/T 596-2021) for the installed secondary circuit. The interval covers the polarity check, the ratio check and the excitation curve, and the verification is repeated whenever the CT is replaced or the reading drifts outside the accuracy band.

How should a CT wiring fault be diagnosed when the reading is outside the accuracy band?

The diagnosis starts with the burden measurement over the installed cable run, because an overburdened CT saturates and the meter reads low while the protection relay sees a distorted signal. The polarity check then confirms the S1 to S2 wiring against the P1 to P2 direction, and the excitation curve confirms the CT core reaches the knee point (GB 50150-2016). The fault is separated by combining the burden result, the polarity result and the excitation curve, so the repair is directed at the wiring or the CT core as the case requires. All three readings are recorded in the same register, because a single reading alone can point at the wiring while the actual fault is the aging core behind the burden.

How should the CT burden be matched to the protection accuracy class?

The CT burden is matched to the protection accuracy class by summing the burden impedance of the cable, the terminal block and the relay, and comparing the total against the rated VA of the CT (IEC 61869-2:2012). A 5P20 class CT is selected when the fault current must be reproduced within 5% composite error for 20 ms, while a 10P10 class CT is selected when the accuracy requirement is relaxed.

Conclusion

Recommended configuration

Shortlist the instruments below and confirm the voltage class and accuracy against your site survey.

FunctionRecommended modelSelection note
PrimaryHF-TC-649 Transformer Core Grounding Current Testerroutine and acceptance testing
ComplementaryHF-TC-623 Transformer Core Ground Current Testerroutine and acceptance testing

CT wiring verification turns a scheduled switchgear check into a measurable secondary-circuit judgement, and its value comes from how the wiring, the burden and the grounding are set together before the metering error and the protection miss occur. Follow the current transformer wiring guide procedure, choose the wiring option matched to the metering and protection duty, set the burden within the rated VA, compare the polarity and the ratio against the nameplate, and confirm all the wiring layers are present before the signal is trusted for operation. Related solution: Monitor-Test Power Tester. A safe circuit is a test pass that is confirmed against the burden band and the full wiring pass for the secondary current margin.

References

Related reading

Request a Quote