Air insulated switchgear is the metal-enclosed assembly that switches, protects and isolates a medium-voltage or high-voltage circuit, using air as the insulation medium between the live parts and the earthed metal enclosure. It is the workhorse of the substation and the plant: where gas-insulated switchgear hides its conductors in a sealed metal tube, air insulated switchgear exposes them to the air inside a compartment, which makes it cheaper, simpler to extend, and easier to inspect, but larger and dependent on the cleanliness of the air it breathes. Understanding this trade-off is the whole of the selection decision.
Author: Zhang Wei, Senior Power Test Engineer, Baoding Houfeng Trading Co., Ltd. — 12 years in switchgear testing and substation equipment LinkedIn
Reviewed by: Li Ming, PE — verified against IEC 62271-200:2021, IEC 62271-1 and IEEE C37.04
Last updated: 2026-10-27
What is air insulated switchgear
The assembly is a metal-enclosed unit that switches, protects and isolates a circuit using air as the dielectric between the live parts and the earthed metal enclosure. The name is descriptive rather than marketing: the phase conductors are bare metal inside each compartment, separated from each other and from the earthed metal case only by the air that fills the compartment. The name is descriptive, not marketing: the phase conductors are bare metal inside each compartment, separated from each other and from the earthed metal case only by the air that fills the compartment. In an air insulated switchgear ais installation that single design choice — air instead of oil, vacuum or compressed gas — drives every consequence that follows, the lower cost, the larger footprint, the need for a clean and dry environment, and the ease of adding and rearranging bays.

In the trade the abbreviation AIS is used to distinguish it from the gas-insulated type, and the two are often compared directly. An AIS bay is a metal-clad cubicle containing a circuit breaker, a disconnector or load-break switch, a current transformer and a voltage transformer, all mounted on a common steel frame and separated by metallic or composite barriers. The compartments are sealed enough to contain an internal arc, but open enough that the operator can see and reach the parts inside during maintenance.
The structure and how AIS works
A single AIS bay is modular by design, built from four compartments that stack on a common steel frame and bolt into a row of cubicles that share one busbar running the incoming and outgoing phases along the top of the lineup. A typical bay has a breaker compartment housing the interrupting device, a busbar compartment running the incoming and outgoing phases along the top, a cable compartment at the bottom where the power cables and the transformer or line connections land, and a control compartment holding the relay, metering and wiring on the front door. Between the compartments, metallic barriers and phase separators keep the arcs and the phases apart, and the whole assembly is bolted into a row of cubicles that share the busbar.

The interrupting device is usually a vacuum circuit breaker for medium voltage or an SF6 circuit breaker for higher voltage, mounted on a withdrawable carriage so it can be rolled out for inspection. When the breaker is closed, the phase conductors run continuously from the busbar through the breaker contacts to the cable compartment; when it is open, the contacts separate in air and the arc is extinguished in the breaker’s own interrupter. The disconnector, a separate switch with visible contacts, then provides the visible air gap that proves the circuit is isolated before the compartment is entered.
Air insulated switchgear vs gas insulated switchgear
The choice between the two comes down to the insulation medium, because the medium decides the physical size: air needs large clearances so the bay is bulky, while a sealed SF6 gas tube insulates at a fraction of that distance so the bay is compact. In the gas-insulated type the phase conductors are enclosed in a sealed metal tube filled with SF6 gas, which insulates and interrupts at a fraction of the clearance air needs, so a GIS bay is far smaller and can be installed in a fraction of the floor space. In AIS the conductors are in air, so the phase-to-phase and phase-to-earth clearances are large, the compartment is large, and the bay is large. The trade-off runs both ways: GIS is compact and almost maintenance-free but expensive and hard to extend, AIS is bulky but cheap, flexible and easy to inspect.
| Property | AIS (air insulated) | Gas insulated switchgear (GIS) |
|---|---|---|
| Insulation medium | air | SF6 gas |
| Footprint | large | compact, a fraction of the AIS footprint |
| Extension | easy, add a bay | hard, requires reconstruction |
| Maintenance | accessible, visible contacts | minimal, sealed compartments |
| Environment sensitivity | high | low |
| Cost | lower | higher |
The choice follows the site. Where floor space is plentiful, the load will grow, and the operator wants to inspect and extend the assembly, AIS is the default. Where the substation is in a dense urban core, on a platform, or the bays will rarely change, the compactness of GIS wins. The comparison is a site decision, not a product-quality decision. In floor-space terms an AIS bay of a given rating typically needs roughly 300% of the area an equivalent GIS bay needs, because air clearances are large (IEC 62271-200:2021).
Key specifications to compare
The specifications that decide whether a bay will do the job are the rated voltage, the normal current, the short-time and peak withstand, the internal arc classification, the IP degree of protection and the busbar configuration, and each maps to a duty the assembly must carry. The first is rated voltage, the maximum continuous and switching voltage the assembly is built for; a 12 kV bay suits distribution, a 24 kV or 36 kV bay suits the higher distribution and subtransmission levels. The second is rated normal current, the continuous current the busbar and breaker carry without exceeding their temperature limits; this follows the load, and a lightly loaded bay can be oversized for future growth. The third is rated short-time withstand current and peak withstand current, the ability to carry and close against a fault for the few cycles the protection allows.

The fourth is internal arc classification (IAC), the rating that proves the cubicle contains an arcing fault without endangering the operator or damaging the adjacent compartments; IEC 62271-200:2021 defines the IAC arc-fault test, and a classified bay is marked to the tested pressure and the accessible-part conditions. The IAC test directs an internal arc at the rated short-time current for up to 1000 ms and measures the pressure and the accessibility of the hot parts (IEC 62271-200:2021). The fifth is degree of protection (IP), the ingress protection of the compartments against dust and water; a higher IP code means a more sealed cubicle, which matters where the ambient air is dirty or wet. The sixth is busbar rating and configuration, whether the assembly is single-bus, double-bus or ring-main, which decides the switching flexibility and the outage scope.
Standards and type tests
The assembly is governed by the IEC 62271 series, with IEC 62271-200 as the product standard for AC metal-enclosed switchgear up to 52 kV, IEC 62271-1 for common requirements and testing, and IEC 62271-100 for the circuit-breaker, while the IEEE C37 series applies in North America. IEC 62271-200:2021 is the product standard for AC metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to 52 kV; it defines the ratings, the construction requirements, the type tests and the internal arc classification. IEC 62271-1 is the common specification that supplements the product parts on general requirements, testing and service conditions. IEC 62271-100 covers the high-voltage AC circuit-breakers that the interrupting device is built to.

In North America the IEEE C37 series applies: IEEE C37.04-2018 is the standard for the rating structure of AC high-voltage circuit breakers, covering the full 4.76 kV to 800 kV range, IEEE C37.09-2018 is the standard test procedure on a symmetrical-current basis, and IEEE C37.010 is the application guide. The type tests that matter to the buyer are the dielectric withstand test, the switching test, the short-time and peak withstand test, the internal arc test and the temperature-rise test; a bay that has passed these at the type-test level carries the marking that the buyer should verify before purchase. Because the breaker must close onto a fault, the first making peak reaches about 250% of the rms fault current (IEEE C37.09-2018), which is why the peak withstanding rating in the table above is set well above the short-time value.
Installation and maintenance
Installation is where the air-insulation choice is tested, because the compartments depend on the air for insulation so the assembly must go into a clean, dry and ventilated environment, with the busbar alignment, phase separation and bolted-joint torque checked before it is energised. Because the compartments depend on the air for insulation, the assembly must be installed in a clean, dry, ventilated environment; a bay installed in a dusty, humid or corrosive atmosphere will lose dielectric strength over time, and the IP rating and the filtering become the protection. The busbar alignment, the phase separation and the torque of the bolted connections are checked at installation, because a loose joint becomes a hot spot and a misaligned phase becomes an flashover path .

Maintenance follows a fixed rhythm. The vacuum or SF6 breaker is the item that needs the most attention: its operating mechanism, its contacts and its dielectric medium are checked at the interval the manufacturer specifies. The busbar and the bolted joints are thermally imaged on a schedule to catch loose connections before they overheat. The secondary circuit, the relay and the wiring are tested with the relay test set described in the protective-relay guide, to confirm the protection still operates. The insulation of the compartments is verified by the dielectric test, and the internal arc classification is verified only at type-test, not in service. The type-test temperature-rise limit caps the temperature rise of bolted joints at 65 K so the connections do not overheat in service (IEC 62271-1). The maintenance schedule is the manufacturer’s, and deviating from it is the single most common cause of an unplanned outage .

Boundary and limitations
First, the switchgear switches and protects but does not generate, transform or distribute power on its own, because it is only the switching and protection element between the source and the load while the transformer, cable and protection relay are separate equipment with their own standards. It is the switching and protection element between the source and the load; the transformer, the cable and the protection relay are separate equipment with separate standards, and the switchgear’s performance depends on the protection scheme set behind it.
Second, the air insulation makes the bay sensitive to the environment. A cubicle installed where the air carries conducting dust, moisture or corrosive gas will lose dielectric strength, and the IP rating and the ventilation are the only defence. Where the ambient air cannot be controlled, a gas-insulated or solid-insulated alternative should be considered, because no amount of maintenance will restore the dielectric strength of contaminated air faster than it is lost.
Third, the internal arc classification is a type-test result, not an in-service property. The bay is tested once, at the factory, to the IAC rating it is marked with; in service the rating is a promise about the design, not a measurement of the installed unit. Where the installation, the maintenance or the loading has changed from the type-tested condition, the arc containment of the specific bay must be re-assessed against the actual configuration.
Key takeaways
- The assembly switches, protects and isolates a circuit using air as the insulation between the live parts and the earthed enclosure.
- The structure is modular: busbar, breaker, cable and control compartments stack into a cubicle that shares the busbar with the row.
- AIS is large, cheap, flexible and inspectable; the gas-insulated type is compact, sealed and expensive — the choice follows the site, not the product quality.
- Compare the rated voltage, normal current, short-time and peak withstand, internal arc classification, IP rating and busbar configuration.
- The standards are IEC 62271-200:2021 for the product, IEC 62271-1 for common requirements, IEC 62271-100 for the breaker, and IEEE C37.04 / C37.09 / C37.010 in North America.
Need a quotation for a switchgear test set?
Tell us the equipment you need to test, the voltage class and the quantity. Our engineers reply with a technical proposal and a quotation within 12 hours — English manual, remote video guidance and a one-year warranty on exported units.
Payment terms agreed per order · Lead time confirmed per order
Frequently asked questions
What is the difference between AIS and gas-insulated switchgear?
The difference is the insulation medium. AIS uses air as the dielectric between the live parts and the earthed enclosure, so the clearances are large and the bay is bulky but cheap, flexible and easy to inspect. The gas-insulated type encloses the conductors in a sealed metal tube filled with SF6 gas, so the clearances are a fraction of the air ones and the bay is compact but expensive and hard to extend. The choice follows the site: AIS where space and growth matter, GIS where compactness and sealed maintenance matter.
What is AIS used for?
It switches, protects and isolates a medium-voltage or high-voltage circuit in a substation, a plant or a distribution network. The bay carries the busbar current, breaks the load and the fault current through the circuit breaker, provides the visible air gap of the disconnector for isolation, and houses the transformers and relays that meter and protect the circuit. It is the standard switching element wherever the medium-voltage distribution is assembled in a switch room.
How much floor space does AIS need compared to GIS?
Because air needs large phase-to-phase and phase-to-earth clearances, an AIS bay is several times the physical size of a gas-insulated bay of the same rating, and a complete AIS lineup occupies a fraction of the floor space a GIS lineup does. The exact ratio depends on the voltage and the manufacturer, but the compactness of GIS is the reason it is chosen for dense urban substations, platforms and any site where the bays must fit a limited footprint.
What is the internal arc classification (IAC)?
The internal arc classification is a rating, defined in IEC 62271-200:2021, that proves the cubicle contains an internal arcing fault without endangering the operator or the adjacent compartments. The bay is type-tested by initiating an arc inside it and measuring the pressure, the gases and the accessibility of the hot parts, and it is marked to the tested class. It is a factory type-test result, not an in-service measurement, so the rating is a promise about the design.
What standards apply to air insulated switchgear?
The product standard is IEC 62271-200:2021 for AC metal-enclosed switchgear up to 52 kV, supplemented by IEC 62271-1 for common requirements and IEC 62271-100 for the circuit-breaker. In North America the IEEE C37 series applies: IEEE C37.04 for the rating structure, IEEE C37.09 for the test procedure and IEEE C37.010 for the application guide. A buyer should verify that the bay has passed the dielectric, switching, withstand, internal arc and temperature-rise type tests at the relevant level.
Why is AIS sensitive to the environment?
Because the air is the dielectric, the dielectric strength of the compartment depends on the cleanliness and the dryness of the air it contains. Conducting dust, moisture or corrosive gas lowers the breakdown voltage, so a cubicle installed in a dirty or humid atmosphere will lose insulation strength over time. The IP rating and the ventilation are the defence, and where the ambient air cannot be controlled, a gas-insulated or solid-insulated alternative is the better choice.
Conclusion
Recommended configuration
Shortlist the instruments below and confirm the voltage class and accuracy against your site survey.
| Function | Recommended model | Selection note |
|---|---|---|
| Primary | Switchgear Test Power Supply | routine and acceptance testing |
| Complementary | Contact Resistance Tester | routine and acceptance testing |
Configure this setup for your site →
The air-insulated choice is practical wherever the site has the space, the growth and the need to inspect and extend the assembly. It switches and protects through a circuit breaker in air, it is modular and cheap, and it is governed by the IEC 62271-200:2021 product standard with the IEEE C37 series in North America. The selection decision is the trade-off against the gas-insulated type: the bulk and the environmental sensitivity of air against the compactness and the sealed maintenance of gas. Compare the electrical ratings, the internal arc classification and the IP rating, install the bay in a clean and dry environment, and follow the manufacturer’s maintenance schedule, and the air insulated switchgear will hold its dielectric strength and its switching performance for the life of the substation.
Explore related switchgear test equipment
The full switchgear tester range covers every step from installation verification to in-service diagnostics. Four instruments are worth comparing for a switchgear campaign:
- Switchgear Test Power Supply — the power source that energises the bay for the dielectric and switching tests.
- Contact Resistance Tester — measures the resistance of the bolted and contact joints to catch the hot spots before they overheat.
- SF6 Gas Density Relay Calibrator — calibrates the gas-density relay that monitors the SF6 breaker inside the cubicle.
- High and Low Voltage Switchgear Tester — the multi-function tester for the dielectric, switching and protection functions of the whole assembly.
Contact our engineering team for a switchgear testing campaign plan tailored to your substation, or request a datasheet for the units above.