HF-WC-632 High and Low Voltage Switchgear Tester
High and Low Voltage Switchgear Tester realizes integrated performance testing for power switch cabinets. It measures loop resistance, insulation resistance and breaker tripping characteristics, widely used for factory acceptance, substation commissioning and routine maintenance of high and low voltage distribution equipment.
Send your requirements, we will quote for you within 12 hours
Overview
High and Low Voltage Switchgear Tester is an all-in-one testing device developed for power distribution equipment inspection. It integrates multiple testing functions to evaluate the overall performance of switch cabinets, including loop resistance, insulation performance and circuit breaker operating characteristics. Suitable for factory acceptance, on-site commissioning and daily maintenance of high and low voltage switchgear in power grids, industrial plants and new energy projects, it greatly improves testing efficiency and ensures safe operation of distribution systems.
Technical Parameters
| Item | Specification |
|---|---|
| Input Power Supply | 3-phase 4-wire AC 380V |
| 3-phase AC Adjustable Output | 1 set, 0–10A (100V, adjustable) |
| 3-phase AC Fixed Output | 1 set, 100V |
| AC Operating Voltage Output | AC 0~45V, current < 10A at 220V |
| DC Operating Voltage Output | DC 0~260V |
| DC Fixed Voltage Output | 1 set, 24V / 36V / 110V / 220V |
| 3-phase Power Factor Adjustable Range | cosφ: -0.3 ~ 1 ~ 0.1 (3 phases independently adjustable), current signal amplitude: 1A |
| Single-phase AC 220V Fixed Output | 2 sets, socket type |
| 3-phase AC 380V Fixed Output | 1 set, terminal post type |
| Overall Dimensions | 750 × 570 × 960 mm |
| Weight | 45 kg |
Operating Steps
- Check the equipment and test cables for damage, and confirm all connections are intact.
- Connect the input power cable to the 3-phase 4-wire AC 380V power supply.
- Wire the tested high/low voltage switchgear correctly according to test requirements.
- Switch on the tester, select the corresponding test function and set relevant parameters.
- Start the test, observe real-time data and record test results.
- After testing, stop the output first, then power off the instrument.
- Disconnect the test wiring and input power in sequence, sort out all cables.